Prefab Building Solution

We K-home built in 2007, on the past over 10 years, we focused on doing prefan building very well – making it easy for you to get the temproary you need. So you’re ready to work from day one.
Chat Now

Product Details

Prefab Building Solutions

We K-home built in 2007, on the past over 10 years, we focused on doing prefan building very well – making it easy for you to get the temproary  you need. So you’re ready to work from day one.

Two-Storey-Steel-Structure-Prefab-House-Prefabricated-Building-Prefabricated-House (1)

Prefab Building Using note

1) All open fires are prohibited in the Prefab Building: the Prefab Building can not be used as kitchen and power distribution room; it is forbidden to cook and cook, prohibit burning incense sticks;

 2) The installation of the electrical circuit of the Prefab Building must meet the requirements of the specification: all the wires should be clearly covered and the tube should not be ignited, and the phenomenon of connecting the wires should be prevented; the lamps should be kept at a safe distance from the wall, and the fluorescent lamps should be electronically ballasted. , the wire passes through the color steel sandwich panel wallboard, must be set of porcelain tube or other non-combustible plastic tube; used as temporary dormitory and office space movable board room, each unit and each board room must be installed qualified Leakage protection switch and short circuit, overload protection switch; electric cooker, electric stove, electric cup, electric rod and other electric heating appliances should be prohibited in the board room; lightning protection device should be installed in the movable board room, steel structure should have grounding protection; Electric welding ground wire.

3) The Prefab Building cannot be used as a dangerous goods warehouse. It is forbidden to store flammable and explosive chemical dangerous goods such as kerosene and gasoline and other flammable sundries.

4) It is used as a Prefab Building m for temporary dormitory and office space. Each unit has at least one window and one window. The dining hall cannot be built with temporary dormitory or office space.

5) The Prefab Building must be equipped with fire-fighting equipment such as carbon dioxide and ABC dry powder and fire hydrants as required ensuring that the fire water supply flow and pressure meet the self-rescue requirements.

6) The supervision unit shall urge the project manager department to conduct comprehensive investigations on the construction site and eliminate all kinds of fire hazards. The fire safety supervision and inspection on the construction site shall be strengthened, and the fire hazards must be supervised and corrected on the spot.


Hot Tags: prefab building solution, China, manufacturers, suppliers, customized

Inquiry

You Might Also Like