Prefab House Order From Malaysia Ready To Ship

- Aug 12, 2018-

On August, 2018, we have the new order from Malaysia customer, totally 1000 square meter prefab house for arranging the worker as a dorimitory. After get the order, we use 1 week to arranging production for prefab house, and 1 day for quality inspection. 2 days to load the products, and mark number on each parts, totally use 3 x 40HQ shipping container for this project. Malaysia customer are very appreciate for our quick and professional wrok to solve the question about dorimitory, and said will cooperate with us agian next time.

Prefab house loading  (1).jpg

House Steel Structure


Prefab house loading  (3).jpg

House Steel Struture 


Prefab house loading  (2).jpg

House Steel Struture 

Prefab house loading  (5)

Prefab house loading  (4)