Prefab Staff Accommodation

Modular prefab buildings and prefabricated accommodation are ideal for staff accommodation in the mining.Standard Modular are 3mx6mx3m high.
Chat Now

Product Details

 Brief Introduction of Container Prefab Staff Accommodation

        

image001


image002


K-HOME is one of the leading Manufacturers & Suppliers of Prefabricated Staff Accommodation , Prefabricated Labour Hutment Manufacturer.This staff accommodation unit allows you to house staff or offer private units for rental or holiday accommodation. Prefab solutions reduce site disruption

Staff Accommodation Inside Show



image004

                            

Container House Structure  


Detail Specification of Container Mobile Office 


sizeNumber of floorsSingle Floor
Number of container house6 units
Covered Area108 m2
Length6000mm
Width18000mm
Height2800mm
Floor SystemSteel frame3mm Galvanized Steel for main structure + 1.5mm square tube for secondary beam
Floor15mm chipboard + PVC leather floor
Roof SystemSteel frameSteel frame is Q235 galvanized fitting;
Roof insulationCeiling is blue color steel pre-coated 0.4mm outside strong steel sheet;
With 50mm glass wool insulation material;
Roof ceilingCeiling is shaped steel plate with different pattern
Column SystemColumn2.5mm Shaped Galvanized Steel
Sandwich Wall SystemWall Panel50mm EPS Foam Sandwich Panel ;
Outside color is light silver gray (0.35mm thickness steel );
Inside is white color steel (0.35mm thickness steel ).
Door & window systemDoorMaterial: Steel door
Size: 2000*980mm(H*W)
WindowMaterial: Aluminum alloy steel double hollow glass sliding window (including screens)
Size:1200*1000mm(H*W)
Electric systemIncludes ordinary LED light, A-SW double sockets 2set, A-SW air-switch 2 set,
Electrical box with safety protection device connecting cable for connecting;
AccessoriesElectric wire; sealant; wiring tube; screws and other accessories.

Optional Furniture 



Container House Steel production & installation



I) Detail Parts Show.


Features of Container Dormitory Room

The quick build times of a prefab unit means your workers are in rental accommodation for less time, which keeps costs down.Because each unit is built to a set plan, and homes are built frequently the cost savings achieved with prefab homes are often higher than project-based kitset solutions.  This means your prefab unit is working to save you money before it even leaves the factory.

Staff quarters never looked so good. This prefab house is a modern and comfortable place to wind down after a long day on the far.


Project Show





Qualification Honor 

Customer visiting


Delivery Site


FAQ

 1. How can the products adopt to different climates)?
Strong wind region:   improve the wind-resisting ability of the internal structure.
Cold region: increase the thickness of the wall, or use good insulation material, improve anti-pressure ability of the structure.
High corrosion region: use corrosion resistant material, or paint anti corrosive coating.
2. How about the payment?
By TT, 40% deposit in advance, the 60% balance before the delivery.
3.How long is the delivery time?
Regularly 7-15 days, this depends on quantity and products.

4. How about the delivery date?
Yes. We can accord your requirements.


Contact


Henan K-homeimage024
Tel: +86-373-2511966
Whatsapp: +86-18790630368 
E-mail: info@khomechina.com
Add: Xinxiang, Henan, China






Hot Tags: prefab staff accommodation, China, manufacturers, suppliers, customized

Inquiry

You Might Also Like