Prefab Container Dorms for Student

Since the advent of steel structures, the construction technology with container modules has been the first building technology revolution in 100 years. When the construction workers cover the building, they only need to put one container module from low to high stacked wood general code, and...
Chat Now

Product Details

Since the advent of steel structures, the construction technology with container modular has been the first building technology revolution in 100 years. When the construction workers cover the building, they only need to put one container from low to high stacked wood general code, and then bolt it. Container technology can reduce construction time by 50%, while being safer and cleaner, more environmentally friendly than traditional brick and block construction methods.


Product Layout

Series No.: KHCD05

This prefab container dorms for student, combined by 12 container houses. Total two floors, each floor has 6 container rooms. There is 5 sing beds in each room. According to the space put the wardrobe. And plus outdoor staircase and corridors. Suit for 60 students.


KHCD05 First Floor House Layout

image001


KHCD05 Second Floor House Layout

image003


Inside View

image005(001)



Product Advantage

1.Inexpensive but multifunctional
Can be used as temporary living room / dormitory / home / office / meeting room / classroom / kitchen / canteen.

2.Strength and durability
Shock-resistant & wind-resistant q235(yield strength)steel frame.
Good quality EPS sandwich panel brings heat insulation and damp proof make comfortable living. The prefab container house is designed as water proof, so extra waterproof treatment is unnecessary

3.Movable and recyclable
Can be moved by any kind of vehicle after convenient disassembly construction site/ campsite/ mine lot/mountain area/disaster area
Prefab container houses can be recycled more than 5 times in it is 20 years long service lifetime.
100% of the steel structure and 90% of the EPS panel can be recycled in next assembly.

4.Convenient installation and Labor-saving
All the parts of steel frame and EPS panel are done in factory, all need to do in the construction field is to connect and stack
100 SQM prefab container house will just cost 2 days by only 4 workers.
The welding and cutting of steel is considered to be specialized labor and can increase construction expenses, yet overall it is still lower than conventional construction.

5.Transport
Prefabricated modules can also be easily transported by ship, truck or rail, because they already conform to standard shipping sizes.


Product Show



image009


FAQ

Q: Are you trading company or manufacturer?

A: We are factory.


Q: How long is your delivery time?

A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.


Q: Do you provide samples ? is it free or extra?

A: Yes, we could offer the sample for free charge but you need to pay the cost of freight.


Q: What is your terms of payment?

A: 30% T/T in advance ,balance before shipment.


Inquiry